Sunday, March 30, 2014

Handover


Write up to follow :)




Granada (Renalla facade)
garage
hallway and staircase
powder room
living area (view from the back)

living and dining area (view from kitchen island)

kitchen


kitchen
kitchen (view from pantry)
kitchen island
laundry
walk in pantry

fridge slot (left hand side) and walk in pantry


staircase and window across the rumpus


masters bedroom - view from the door
masters bedroom walk in robe


ensuite
ensuite


common bathroom

common bathroom (door dividing the toilet and the shower has been removed)

bathroom

bedroom 2





bedroom 3

bedroom 4


living, dining and kitchen island



our gift from PD

Tuesday, July 24, 2012

Fixing Stage - Week 12

Render has started.
Photos taken on 23 June 2012

front view with render

side view with render

render

gutter and fascia in Colorbond Jasper

downpipe in Colorbond Jasper

entry to living area

Fixing Stage - Week 11

Fixing Stage has started.  Architraves have been installed.
Photos taken on 16 June 2012


back view

side view
living area wall
hallway architraves


Lock Up Stage - Week 10

Plastering has commenced.
Photos taken on 09 June 2012

rumpus

living/dining area

masters bedroom

front view of the house

Lock Up Stage - Week 9

Plumbing, electricals and heating installed
Photos taken on June 2

front view

unpainted doors

heating roughin

masters bedroom window

Lock Up Stage - Week 8

Brick work is almost complete
Taken on 26 May 2012


side view


front view

Lock Up Stage - Week 7

Brick work has started
Taken on 19 May 2012


view from the side


front view

side view

back view

brick work has started

bricks delivered

boral brushwood bricks

garage

bricks from inside of the garage

rumpus