Tuesday, July 24, 2012

Fixing Stage - Week 12

Render has started.
Photos taken on 23 June 2012

front view with render

side view with render

render

gutter and fascia in Colorbond Jasper

downpipe in Colorbond Jasper

entry to living area

Fixing Stage - Week 11

Fixing Stage has started.  Architraves have been installed.
Photos taken on 16 June 2012


back view

side view
living area wall
hallway architraves


Lock Up Stage - Week 10

Plastering has commenced.
Photos taken on 09 June 2012

rumpus

living/dining area

masters bedroom

front view of the house

Lock Up Stage - Week 9

Plumbing, electricals and heating installed
Photos taken on June 2

front view

unpainted doors

heating roughin

masters bedroom window

Lock Up Stage - Week 8

Brick work is almost complete
Taken on 26 May 2012


side view


front view

Lock Up Stage - Week 7

Brick work has started
Taken on 19 May 2012


view from the side


front view

side view

back view

brick work has started

bricks delivered

boral brushwood bricks

garage

bricks from inside of the garage

rumpus

Lock Up Stage - Week 6

Lock Up Stage has started, roof installation has commenced
Taken on 12 May 2012




roof installation


roof tiles delivered

portico
living room frame and windows

found this in the powder room area... hmm not sure if it's acceptable

garage



Sunday, May 6, 2012

Frame Stage - Week 5

Framing at the first level.
Taken on 05 May 2012
 
Front View
Side View
Rear View

Frame Stage - Week 4

Framing at the ground level
Taken on 28 April 2012
Front View
Side View

Frame Stage - Week 3

Frame Stage started. Taken on 21 April 2012
windows delivered

side view

portico

Base Stage - Week 2

Base Stage Started. Taken on 14 April 2012.
Side View

Front View

Garage is the biggest room of the house lol